![]() ![]() The BLM manages public lands and resources for the benefit of current and future generations, and is committed to providing for environmentally responsible energy development that contributes to America’s energy independence.įor more information on this project, contact BLM geologist Mark Spendel at BLM Bishop Field Office, 76. Sound barriers or other noise dampening devices will be required if sound levels exceed specified levels. Take a look at our Casa Diablo IV project - the first geothermal project to be built in the state of California in 30 years The project is set to come online this summer and provide 30 MW of firm, zero-emission power to customers in the region. Nearby roads and trails are expected to remain open, except for limited temporary closures to ensure public safety.ĭrilling operations will run 24-hours per day, seven days per week, for about three weeks. Residents and visitors should anticipate increased activity and vehicle traffic along Sawmill Cutoff Road between the town of Mammoth Lakes and Shady Rest Park. The Bureau of Land Management Bishop Field Office, in coordination with the Inyo National Forest Mammoth Lakes Ranger District, approved the installation as part of the Groundwater Monitoring and Response Plan for the Casa Diablo IV Geothermal Development Project. ![]() PROJECT DESCRIPTION Ormat Nevada Inc., proposes to build, and following the expected 30-year useful life, decommission the Casa Diablo IV Geothermal Development Project (CD-IV) in the vicinity of the existing Mammoth Pacific L.P. have started work on a geothermal monitoring well on an existing well pad just south of Shady Rest Park, near Mammoth Lakes. Valley Known Geothermal Resource Area (KGRA) in Mono County, California. As reported in a release by the Bureau of Land Management, crews working for Ormat Nevada, Inc. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |